Inside the Namtheun One Project
Discover the key systems that turn the Namtheun One Hydropower Project into a resilient, efficient source of clean energy for Laos and the region.
The Namtheun One Hydropower Project (HPP)
The Namtheun One Hydropower Project (HPP) is a large-scale hydroelectric facility located on the Nam Kading River in Bolikhamxay Province, central Laos—about 220 km from Vientiane and 33 km upstream from the Mekong River.

Water Source and River System
Namtheun One is the final dam in a series of hydro projects on the Nam Theun–Nam Kading River system. It receives regulated water flow from several upstream hydropower plants, including Theun Hinboun and Nam Theun 2, which significantly influence the inflow into theNamtheun Onene reservoir.

Reservoir and Dam
The Namtheun One Hydropower Project features a curved gravity dam constructed using RCC (Roller-Compacted Concrete) technology, selected for its cost efficiency and accelerated construction timeline. The dam stands 177 meters high, with a crest elevation of 297 meters above sea level, and is founded on sandstone and mudstone bedrock, providing excellent stability and flood resilience.
It forms a reservoir with a Full Supply Level (FSL) of 292 meters above sea level. Due to environmental constraints, the reservoir has limited storage capacity, operating between FSL and a Minimum Operating Level (MOL) of 250 m asl.
.jpeg)
Water Diversion and Power Tunnel
Water from the reservoir is funneled through a single concrete-lined power tunnel (11.4 meters in diameter), located on the dam’s left abutment. This tunnel splits into steel-lined branches leading to the powerhouse:
- 2 units of 260 MW for EGAT (Thailand)
- 1 unit of 130 MW for EDL (Laos)
- The total installed capacity is 650 MW, with a design flow of 513.7 m³/s.

Power Generation
Water flows through three turbines housed in a surface powerhouse, located about 450 meters downstream of the dam. The turbines convert the water’s kinetic energy into electricity, which is then transferred to the grid via a 500/115 kV switchyard and transmission lines connecting to Laos and Thailand.

Spillway and Flood Management
To manage floods, the dam includes a spillway with six gates capable of discharging up to 30,200 m³/s during extreme flood events. The design adheres to ICOLD flood safety standards and ensures safe operation even during 10,000-year flood scenarios.

Ecological Flow and Environmental Measures
An ecological flow of 5 m³/s is maintained year-round via a dedicated outlet, ensuring that downstream ecosystems remain supported even when the power plant is offline. A bottom outlet is also provided for emergency drawdown and first impoundment control.

Transmission and Power Delivery
The Namtheun One Hydropower Project includes a strategically positioned open-air 500/115 kV AIS switchyard, located approximately 1.7 kilometers downstream from the powerhouse in a flat, accessible area. This switchyard serves as the main hub for energy transmission, efficiently connecting the project to both domestic and regional power grids.
A 154-kilometer-long 500 kV double-circuit transmission line links the site directly to the EGAT grid at the Nabong substation near Vientiane, ensuring reliable power export to Thailand. Additionally, a 6-kilometer-long 2x115 kV line provides a π-connection to the existing Pakxan–Khonsong line, reinforcing the local distribution network within Laos.

Energy Output
Namtheun One is expected to produce approximately 2,561 GWh of electricity annually, making it a significant contributor to regional energy supply and cross-border energy trade.